Kitchen renovations
Layouts planned around how you cook.
Greater Montreal
Down to the studs or a clean refresh. Waterproofed right, tiled tight, and signed off in writing.
Scope of work
Stages, in order
A focused job, in order. Your written quote sets the real schedule before work begins.
Recent work
Posted on Google
5.0 · 15 reviews on Google · as of September 2026
Read all 15 reviewsBefore the visit
Every wet area gets a full waterproofing membrane behind the tile, with the floor sloped to the drain. Curbless showers are waterproofed and sloped the same way, then water tested before the tile goes on.
Permits and inspections are handled where the work needs them. For moving plumbing, ventilation changes or structural work, we pull the borough permit and coordinate the inspections.
It depends on scope and access: a targeted update moves faster than a full gut to the studs. We put the dated schedule in your written quote before any demolition starts.
Our own crew runs the job, with one project lead from the first site visit to the final walkthrough. The licensed plumber, tile setter, and electrician are people we schedule and supervise, not subs you have to chase.
Any change is priced and approved in writing before we carry it out, itemized on its own line rather than folded into an open-ended "miscellaneous labour" charge.
Fixed-scope quote up front, then payments tied to written milestones as the work progresses, not a lump sum before we start. Financing is available through FinanceIt if you want it.
Yes. We hold RBQ licence 5788-2326-01, are registered with the CNESST, and are bonded and insured. You can verify the licence on the Régie du bâtiment public registry.
Three more trades
Layouts planned around how you cook.
Waterproofing, framing and finishes, turn-key.
Paver patios, walkways, plantings and drainage.
Next step
We visit the site and send a fixed-scope quote in writing.